Montana Cob Cottage: Sleeping loft
Sunday, October 19, 2014
Roof going up.
Posted on 8:49 AM
by cristile
Email This
BlogThis!
Share to X
Share to Facebook
Posted in
|
No comments
Newer Post
Older Post
Home
0 comments:
Post a Comment
Subscribe to:
Post Comments (Atom)
Popular Posts
First layer of plaster and sub-floor.
A sample of the final layer of plaster. It will be lighter. We are putting flag stone down in the bathroom under the clawfoot tub. The lof...
Drain Pipe
Pictures are hard to get with the amount of sun we are getting. The 4" perforated pipe is in and ready to drain any moisture out of our...
Second set of rafters
Today we finally reached final wall height and were able to start the second set of rafters for the main house. Each rafter is a 4 diameter ...
Door bucks
We finally got around to building the bucks for the back and front doors. This really added some dimension to our building.
Test Brick
Our test brick came out nicely. We will have to save this one for decorating the house.
(no title)
Gravel!
Well we finally got some gravel for our foundation and base layer for the floor. This 12 ton pile cost $135 and will be more than enough. Lu...
RMH exhaust
Now that the brickwork is done for the RMH, we put down the ductwork for the exhaust to run through. All of the duct here will eventually be...
Plastering bench
RMH update
Thought I should post a video of the rocket mass heater (RMH) that will be keeping Katherine and I warm this winter. Many people are skeptic...
Categories
Plaster
Blog Archive
▼
2014
(52)
►
December
(3)
►
November
(5)
▼
October
(9)
A guide to Earthen Plaster
RMH update
Roof edging
Pond liner on!
First plaster
No title
Roof going up.
Second set of rafters
Beams on
►
September
(4)
►
August
(9)
►
July
(7)
►
June
(10)
►
May
(5)
Powered by
Blogger
.
About Me
cristile
View my complete profile
0 comments:
Post a Comment