Montana Cob Cottage: Sleeping loft
Sunday, August 24, 2014
Windows finished
Posted on 6:14 PM
by cristile
All of the windows are cobbed completely in and the wall is averaging around 6' tall. The loft will most definitely be going in this week.
Email This
BlogThis!
Share to X
Share to Facebook
Posted in
|
No comments
Newer Post
Older Post
Home
0 comments:
Post a Comment
Subscribe to:
Post Comments (Atom)
Popular Posts
First layer of plaster and sub-floor.
A sample of the final layer of plaster. It will be lighter. We are putting flag stone down in the bathroom under the clawfoot tub. The lof...
Second set of rafters
Today we finally reached final wall height and were able to start the second set of rafters for the main house. Each rafter is a 4 diameter ...
(no title)
Thanks Sarah and Lexi for taking these great pictures!
Composting
Took a break from cobbing to make this little garden composting bin. Spins like a charm and I can't wait to garden next year.
RMH update
Thought I should post a video of the rocket mass heater (RMH) that will be keeping Katherine and I warm this winter. Many people are skeptic...
Windows finished
All of the windows are cobbed completely in and the wall is averaging around 6' tall. The loft will most definitely be going in this wee...
Roof going up.
Kaolin plaster
Roof edging
The roof edging was very labor intensive, but totally worth it when finished. All of these boards will serve to hold our living roof from fa...
Gravel!
Well we finally got some gravel for our foundation and base layer for the floor. This 12 ton pile cost $135 and will be more than enough. Lu...
Categories
Plaster
Blog Archive
▼
2014
(52)
►
December
(3)
►
November
(5)
►
October
(9)
►
September
(4)
▼
August
(9)
Sleeping loft
Windows finished
Kitchen windows
Bookshelves
Windows
Kitchen sink
Composting
Walls still climbing and shelves going in
Kitchen counter going in
►
July
(7)
►
June
(10)
►
May
(5)
Powered by
Blogger
.
About Me
cristile
View my complete profile
0 comments:
Post a Comment