Montana Cob Cottage: Sleeping loft

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg

Friday, May 30, 2014

Test Brick

Posted on 7:28 PM by cristile

Our test brick came out nicely. We will have to save this one for decorating the house.
Email ThisBlogThis!Share to XShare to Facebook
Posted in | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • First layer of plaster and sub-floor.
    A sample of the final layer of plaster. It will be lighter.  We are putting flag stone down in the bathroom under the clawfoot tub.  The lof...
  • Second set of rafters
    Today we finally reached final wall height and were able to start the second set of rafters for the main house. Each rafter is a 4 diameter ...
  • (no title)
    Thanks Sarah and Lexi for taking these great pictures! 
  • RMH update
    Thought I should post a video of the rocket mass heater (RMH) that will be keeping Katherine and I warm this winter. Many people are skeptic...
  • Roof going up.
  • Kaolin plaster
  • Cobbing the walls
    The cob walls are finally starting to go up. Here you can see the small holes we push into each layer helping bind the next batch of cob to ...
  • Roof edging
    The roof edging was very labor intensive, but totally worth it when finished. All of these boards will serve to hold our living roof from fa...
  • (no title)
  • RMH insulation
    The brickwork heat riser of the RMH is wrapped in hardware cloth and filled with insulation. We decided to use perlite for the insulation an...

Categories

  • Plaster

Blog Archive

  • ▼  2014 (52)
    • ►  December (3)
    • ►  November (5)
    • ►  October (9)
    • ►  September (4)
    • ►  August (9)
    • ►  July (7)
    • ►  June (10)
    • ▼  May (5)
      • Other landfill goodies
      • Urbanite
      • Leveling and digging foundation
      • Test Brick
      • Site chosen, ready to dig!
Powered by Blogger.

About Me

cristile
View my complete profile