Montana Cob Cottage: Sleeping loft

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg

Wednesday, October 8, 2014

Beams on

Posted on 3:26 PM by cristile
It has been quite some time since we last posted, but we've been very busy on the house. Walls are finally reaching final height and today we decided to muscle up the beams with only three of us and a whole lot of leverage.




We used our 13' pole rafters as a make shift ramp from the bed of the truck to the shortest wall. From there we used a combination of ropes and muscle to shift them up the walls and into place. 



 


Email ThisBlogThis!Share to XShare to Facebook
Posted in | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • First layer of plaster and sub-floor.
    A sample of the final layer of plaster. It will be lighter.  We are putting flag stone down in the bathroom under the clawfoot tub.  The lof...
  • Second set of rafters
    Today we finally reached final wall height and were able to start the second set of rafters for the main house. Each rafter is a 4 diameter ...
  • Plastering bench
  • Drain Pipe
    Pictures are hard to get with the amount of sun we are getting. The 4" perforated pipe is in and ready to drain any moisture out of our...
  • Door bucks
    We finally got around to building the bucks for the back and front doors. This really added some dimension to our building.
  • Test Brick
    Our test brick came out nicely. We will have to save this one for decorating the house.
  • RMH update
    Thought I should post a video of the rocket mass heater (RMH) that will be keeping Katherine and I warm this winter. Many people are skeptic...
  • Windows finished
    All of the windows are cobbed completely in and the wall is averaging around 6' tall. The loft will most definitely be going in this wee...
  • Finishing plaster.
  • (no title)

Categories

  • Plaster

Blog Archive

  • ▼  2014 (52)
    • ►  December (3)
    • ►  November (5)
    • ▼  October (9)
      • A guide to Earthen Plaster
      • RMH update
      • Roof edging
      • Pond liner on!
      • First plaster
      • No title
      • Roof going up.
      • Second set of rafters
      • Beams on
    • ►  September (4)
    • ►  August (9)
    • ►  July (7)
    • ►  June (10)
    • ►  May (5)
Powered by Blogger.

About Me

cristile
View my complete profile