Thursday, June 26, 2014

RMH in place

Posted on 4:32 PM by cristile

Rocket Stove is mortared in place and the barrel's paint stripped off. The paint came off much easier after burning in it a few times.

We also got the remaining gravel into the house for the first base layer of our floor. We will need to spread 1-2 inches of road base for the second base layer to support our earthen floor.

Email ThisBlogThis!Share to XShare to Facebook
Posted in | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • First layer of plaster and sub-floor.
    A sample of the final layer of plaster. It will be lighter.  We are putting flag stone down in the bathroom under the clawfoot tub.  The lof...
  • Second set of rafters
    Today we finally reached final wall height and were able to start the second set of rafters for the main house. Each rafter is a 4 diameter ...
  • (no title)
    Thanks Sarah and Lexi for taking these great pictures! 
  • Composting
      Took a break from cobbing to make this little garden composting bin. Spins like a charm and I can't wait to garden next year.
  • RMH update
    Thought I should post a video of the rocket mass heater (RMH) that will be keeping Katherine and I warm this winter. Many people are skeptic...
  • Windows finished
    All of the windows are cobbed completely in and the wall is averaging around 6' tall. The loft will most definitely be going in this wee...
  • Roof going up.
  • Kaolin plaster
  • Roof edging
    The roof edging was very labor intensive, but totally worth it when finished. All of these boards will serve to hold our living roof from fa...
  • Gravel!
    Well we finally got some gravel for our foundation and base layer for the floor. This 12 ton pile cost $135 and will be more than enough. Lu...

Categories

  • Plaster

Blog Archive

  • ▼  2014 (52)
    • ►  December (3)
    • ►  November (5)
    • ►  October (9)
    • ►  September (4)
    • ►  August (9)
    • ►  July (7)
    • ▼  June (10)
      • RMH in place
      • Discovered a couple free bags of cement which were...
      • RMH build
      • Free bricks!!!
      • More urbanite stacking
      • Stem wall going up!!!
      • Rubble trench finished!
      • Drain Pipe
      • Gravel!
      • Trenches finished!!!
    • ►  May (5)
Powered by Blogger.

About Me

cristile
View my complete profile