RMH build

Posted on 6:03 PM by cristile


 
This is the test burn for our Rocket Mass Heater, which will be the source of heat in our cob home. Fore those who don't know much about RMHs, they are fed vertically with small scraps of wood and burn almost entirely clean (no smoke).

The barrel is a 55 gallon drum that will set over the top of the firebrick chimney and re-burn all the smoke from the fire. The heat is then transferred into a cob bench and in turn heat the house. More photos to come of the build process.
Email ThisBlogThis!Share to XShare to Facebook
Posted in | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • First layer of plaster and sub-floor.
    A sample of the final layer of plaster. It will be lighter.  We are putting flag stone down in the bathroom under the clawfoot tub.  The lof...
  • Second set of rafters
    Today we finally reached final wall height and were able to start the second set of rafters for the main house. Each rafter is a 4 diameter ...
  • (no title)
    Thanks Sarah and Lexi for taking these great pictures! 
  • RMH update
    Thought I should post a video of the rocket mass heater (RMH) that will be keeping Katherine and I warm this winter. Many people are skeptic...
  • Roof going up.
  • Kaolin plaster
  • Cobbing the walls
    The cob walls are finally starting to go up. Here you can see the small holes we push into each layer helping bind the next batch of cob to ...
  • Roof edging
    The roof edging was very labor intensive, but totally worth it when finished. All of these boards will serve to hold our living roof from fa...
  • (no title)
  • RMH insulation
    The brickwork heat riser of the RMH is wrapped in hardware cloth and filled with insulation. We decided to use perlite for the insulation an...

Categories

  • Plaster

Blog Archive

  • ▼  2014 (52)
    • ►  December (3)
    • ►  November (5)
    • ►  October (9)
    • ►  September (4)
    • ►  August (9)
    • ►  July (7)
    • ▼  June (10)
      • RMH in place
      • Discovered a couple free bags of cement which were...
      • RMH build
      • Free bricks!!!
      • More urbanite stacking
      • Stem wall going up!!!
      • Rubble trench finished!
      • Drain Pipe
      • Gravel!
      • Trenches finished!!!
    • ►  May (5)
Powered by Blogger.

About Me

cristile
View my complete profile