Montana Cob Cottage: Sleeping loft

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg

Monday, October 27, 2014

RMH update

Posted on 5:49 PM by cristile
Thought I should post a video of the rocket mass heater (RMH) that will be keeping Katherine and I warm this winter. Many people are skeptical of the design, use and function of this amazing stove. I forgot to get a shot of the cob bench our duct runs through (thermal mass of the heater), but our 8" ducting runs horizontally through 30' of cob mass before exiting the house. The thermal mass traps all of the heat passing through the barrel.




How it works

The chimney within the 55 gallon barrel gives a chimney effect creating a draft down the feed tube (where we burn the sticks) and keeping any flame or smoke from escaping into the house. The incredible heat in the burn tunnel reburns much of the smoke before reaching the barrel. The gases cool rapidly in the much cooler barrel and shrinks adding an extra pull to the system. The hot air is then forced through the bench (losing all of its heat) and exits the house at little over 100 degrees F. This amazing heat transfer allows us to burn less wood, less often and still heat our home.
Email ThisBlogThis!Share to XShare to Facebook
Posted in | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • Door bucks
    We finally got around to building the bucks for the back and front doors. This really added some dimension to our building.
  • Kaolin plaster
  • Cobbing the walls
    The cob walls are finally starting to go up. Here you can see the small holes we push into each layer helping bind the next batch of cob to ...
  • (no title)
  • RMH insulation
    The brickwork heat riser of the RMH is wrapped in hardware cloth and filled with insulation. We decided to use perlite for the insulation an...
  • A guide to Earthen Plaster
    We have made half a dozen earthen plasters with varying ingredients. Below is a guide to a successful mix and application of our plaster. 1)...
  • Plaster is finished!
    Just waiting for the walls to dry fully before we add any more moisture with the floors. 
  • Kitchen windows
    These are the final windows that will go in on this level of the house. More windows will go above the lofted area to shed some light into t...

Categories

  • Plaster

Blog Archive

  • ▼  2014 (52)
    • ►  December (3)
    • ►  November (5)
    • ▼  October (9)
      • A guide to Earthen Plaster
      • RMH update
      • Roof edging
      • Pond liner on!
      • First plaster
      • No title
      • Roof going up.
      • Second set of rafters
      • Beams on
    • ►  September (4)
    • ►  August (9)
    • ►  July (7)
    • ►  June (10)
    • ►  May (5)
Powered by Blogger.

About Me

cristile
View my complete profile