RMH in place

Posted on 4:32 PM by cristile

Rocket Stove is mortared in place and the barrel's paint stripped off. The paint came off much easier after burning in it a few times.

We also got the remaining gravel into the house for the first base layer of our floor. We will need to spread 1-2 inches of road base for the second base layer to support our earthen floor.

Email ThisBlogThis!Share to XShare to Facebook
Posted in | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • Door bucks
    We finally got around to building the bucks for the back and front doors. This really added some dimension to our building.
  • Kaolin plaster
  • Cobbing the walls
    The cob walls are finally starting to go up. Here you can see the small holes we push into each layer helping bind the next batch of cob to ...
  • (no title)
  • RMH insulation
    The brickwork heat riser of the RMH is wrapped in hardware cloth and filled with insulation. We decided to use perlite for the insulation an...
  • A guide to Earthen Plaster
    We have made half a dozen earthen plasters with varying ingredients. Below is a guide to a successful mix and application of our plaster. 1)...
  • Plaster is finished!
    Just waiting for the walls to dry fully before we add any more moisture with the floors. 
  • Kitchen windows
    These are the final windows that will go in on this level of the house. More windows will go above the lofted area to shed some light into t...

Categories

  • Plaster

Blog Archive

  • ▼  2014 (52)
    • ►  December (3)
    • ►  November (5)
    • ►  October (9)
    • ►  September (4)
    • ►  August (9)
    • ►  July (7)
    • ▼  June (10)
      • RMH in place
      • Discovered a couple free bags of cement which were...
      • RMH build
      • Free bricks!!!
      • More urbanite stacking
      • Stem wall going up!!!
      • Rubble trench finished!
      • Drain Pipe
      • Gravel!
      • Trenches finished!!!
    • ►  May (5)
Powered by Blogger.

About Me

cristile
View my complete profile