Thursday, June 26, 2014

RMH in place

Posted on 4:32 PM by cristile

Rocket Stove is mortared in place and the barrel's paint stripped off. The paint came off much easier after burning in it a few times.

We also got the remaining gravel into the house for the first base layer of our floor. We will need to spread 1-2 inches of road base for the second base layer to support our earthen floor.

Read More
Posted in | No comments

Tuesday, June 24, 2014

Posted on 11:40 AM by cristile


Discovered a couple free bags of cement which were put to good use for our RMH platform. We used bricks as a quick form and will hopefully be constructing the RMH tomorrow evening!

Read More
Posted in | No comments

Sunday, June 22, 2014

RMH build

Posted on 6:03 PM by cristile


 
This is the test burn for our Rocket Mass Heater, which will be the source of heat in our cob home. Fore those who don't know much about RMHs, they are fed vertically with small scraps of wood and burn almost entirely clean (no smoke).

The barrel is a 55 gallon drum that will set over the top of the firebrick chimney and re-burn all the smoke from the fire. The heat is then transferred into a cob bench and in turn heat the house. More photos to come of the build process.
Read More
Posted in | No comments

Wednesday, June 18, 2014

Free bricks!!!

Posted on 6:52 PM by cristile

Read More
Posted in | No comments

More urbanite stacking

Posted on 6:36 PM by cristile



Read More
Posted in | No comments

Thursday, June 12, 2014

Stem wall going up!!!

Posted on 3:31 PM by cristile



Read More
Posted in | No comments

Tuesday, June 10, 2014

Rubble trench finished!

Posted on 7:41 PM by cristile


Trenches are filled after one day!! Really took a dent out of our gravel pile. Tomorrow goes on the drain cloth and first layer of urbanite.
Read More
Posted in | No comments

Drain Pipe

Posted on 8:33 AM by cristile



Pictures are hard to get with the amount of sun we are getting. The 4" perforated pipe is in and ready to drain any moisture out of our foundation. We used larger rocks to keep the pipe fixed in place while putting in the gravel and keeping it from pressing against the sides of the ditch.


This is where the pipe Tees and drains away from the house.

Read More
Posted in | No comments

Gravel!

Posted on 8:21 AM by cristile

Well we finally got some gravel for our foundation and base layer for the floor. This 12 ton pile cost $135 and will be more than enough. Luckily, a friend was willing to use a work truck to pick it up and deliver it to the site reducing the $100 delivery fee to a few promised home brews.
Read More
Posted in | No comments

Wednesday, June 4, 2014

Trenches finished!!!

Posted on 9:57 AM by cristile



Finally finished digging the trenches for the rubble foundation. We used our pick axe to draw where the benches and RMH would go. The circle in the middle is our table (3ft wide).

Read More
Posted in | No comments
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Popular Posts

  • Door bucks
    We finally got around to building the bucks for the back and front doors. This really added some dimension to our building.
  • Kaolin plaster
  • Cobbing the walls
    The cob walls are finally starting to go up. Here you can see the small holes we push into each layer helping bind the next batch of cob to ...
  • (no title)
  • RMH insulation
    The brickwork heat riser of the RMH is wrapped in hardware cloth and filled with insulation. We decided to use perlite for the insulation an...
  • A guide to Earthen Plaster
    We have made half a dozen earthen plasters with varying ingredients. Below is a guide to a successful mix and application of our plaster. 1)...
  • Plaster is finished!
    Just waiting for the walls to dry fully before we add any more moisture with the floors. 
  • Kitchen windows
    These are the final windows that will go in on this level of the house. More windows will go above the lofted area to shed some light into t...

Categories

  • Plaster

Blog Archive

  • ▼  2014 (52)
    • ►  December (3)
    • ►  November (5)
    • ►  October (9)
    • ►  September (4)
    • ►  August (9)
    • ►  July (7)
    • ▼  June (10)
      • RMH in place
      • Discovered a couple free bags of cement which were...
      • RMH build
      • Free bricks!!!
      • More urbanite stacking
      • Stem wall going up!!!
      • Rubble trench finished!
      • Drain Pipe
      • Gravel!
      • Trenches finished!!!